|
Working groups area
This page gives access to areas dedicated to the convenor and participants to each SC B3 official working body.
When clicking on a specific WG, you will get a summary of the WG objectives. Then, to enter the protected area you will need to type the password. SAG Strategic Advisory Group
CAG Customer Advisory Group
TAG Tutorial Advisory Group
CG B3/B5/A3 Cooperation Group B3/B5/A3
WG B3.11 Combining Innovation with Standardisation
WG B3.12 Obtaining value from Condition Monitoring
WG B3.13 Reducing replacement time of HV Equipment
WG B3/C1/C2.14 Circuit Configuration Optimisation
JWG B3/B1.09 Application of Long High Capacity Gas Insulated Lines in Tunnels
WG B3.17 Residual Life Concepts Applied to HV GIS
WG B3.18 SF6 Tightness Guide
WG B3.20 Mixed Technologies Switchgear MTS
WG B3.22 Technical requirements for substations exceeding 800 kV
WG B3.15 Cost Reduction of Air Insulated Substations
WG B3.02 Gas Insulated Substations
WG B3.21 Turnkey Substations
WG B3.06 Substation Management
WG B3.10 Primary /Secondary system interface modelling for total asset performance optimization
WG B3.01 Substation concepts
|