| WG B3.13 | Reducing replacement time of HV Equipment |
|
As a result of several, recent major black-outs, the system operators are cautious to allow long intervention periods for maintenance, repair or replacement of HV equipment in substations.
The main tasks of the WG are : - Identify the trends of the replacement policies. - Identify engineering and equipment concepts which may facilitate the replacement in the future. - Identify working methods in order to optimize the outage time and the associated intervention cost. More information available in the Working Body Form available on the SC document page (Click on the link). If you are a member of this Group, please enter your password. |