Structure

SC B3 has currently :

- 3 permanent Advisory Groups assisting the Chairman in the definition of strategic and customer oriented directions,
- Several Working Groups and Task Forces, all approved by the Technical Committee of CIGRE, with definite scope, deliverables and duration.


If you are interested in working in any Working Bodies, if yous wish to make any proposals (of new work) or any suggestions please contact us (see contacts in the SC B3 front page).


Chairman

Franz BESOLD

Secretary

Claude COUNAN


ADVISORY GROUPS
Ref Title Convener Duration
SAG Strategic Advisory Group Franz BESOLD (CH) Permanent
CAG Customer Advisory Group Gerry BREEN (IE) Permanent
TAG Tutorial Advisory Group Franz BESOLD (CH) Permanent
AA1 Advisory Area for Substations Concepts and Developments Hans-Erik OLOVSSON Permanent
CG B3/B5/A3 Cooperation Group B3/B5/A3 Frank BALDINGER (NL) Permanent
 
 
Working Groups - Task Forces
Ref Title Convener Dates
(Creation - Disbanding)
WG B3.12 Obtaining value from Condition Monitoring Arthur MACKRELL (UK) 2005 - 2010
WG B3.13 Reducing replacement time of HV Equipment François GALLON (FR) 2005 - 2009
WG B3/C1/C2.14 Circuit Configuration Optimisation Gerd LINGNER (DE) 2006 - 2010
WG B3.26 Guidelines For The Design And Construction Of AC Offshore Substations For Wind Farms John FINN (UK) 2009-2011
WG B3.17 Residual Life Concepts Applied to HV GIS Karsten POHLINK (CH) 2006 - 2009
WG B3.18 SF6 Tightness Guide Peter GLAUBITZ (DE) 2006 - 2009
WG B3.22 Technical requirements for substations exceeding 800 kV Takeshi YOKOTA (Japan) 2007 - 2009
WG B3.25 25 SF6 gas analysis for AIS, GIS and MTS condition assessment Eamonn DUGGAN (IR) 2009-2011
WG B3.21 Turnkey Substations Tibor KERTESZ (Canada) 2007 - 2010
WG B3.23 Guidelines for uprating and upgrading of substations Hiroshi IMAGAWA (JP) 2009-2011
WG B3.06 Substation Management Johan Smit (NL) 2004 - 2010
WG B3.10 Primary /Secondary system interface modelling for total asset performance optimization Frank BALDINGER (NL) 2006 - 2009
WG B3.01 Substation concepts (just disbanded) John FINN (UK) 2004 - 2009
JWG B3/B1.09 Application of Long High Capacity Gas Insulated Lines in Tunnels (just disbanded) Hermann KOCH (DE) 2005 - 2009