|
Structure
SC B3 has currently :
- 3 permanent Advisory Groups assisting the Chairman in the definition of strategic and customer oriented directions, - Several Working Groups and Task Forces, all approved by the Technical Committee of CIGRE, with definite scope, deliverables and duration. |
|
Chairman |
Secretary |
| ADVISORY GROUPS |
| Ref | Title | Convener | Duration |
| SAG | Strategic Advisory Group | Auke WIERSMA (NL) | Permanent | CAG | Customer Advisory Group | Gerry BREEN (IE) | Permanent | TAG | Tutorial Advisory Group | Franz BESOLD (CH) | Permanent | CG B3/B5/A3 | Cooperation Group B3/B5/A3 | Frank BALDINGER (NL) | Permanent |
| Working Groups - Task Forces |
| Ref | Title | Convener | Dates (Creation - Disbanding) |
| WG B3.11 | Combining Innovation with Standardisation | John FINN (UK) | 2005-2008 | WG B3.12 | Obtaining value from Condition Monitoring | Arthur MACKRELL (UK) | 2005-2008 | WG B3.13 | Reducing replacement time of HV Equipment | François GALLON (FR) | 2005-2007 | WG B3/C1/C2.14 | Circuit Configuration Optimisation | Peer REIMER | 2006-2008 | JWG B3/B1.09 | Application of Long High Capacity Gas Insulated Lines in Tunnels | Hermann KOCH (DE) | 2005-2007 | WG B3.17 | Residual Life Concepts Applied to HV GIS | Chris JONES (UK) | 2006-2007 | WG B3.18 | SF6 Tightness Guide | Peter GLAUBITZ (DE) | 2006-2007 | WG B3.20 | Mixed Technologies Switchgear MTS | Wolfgang DEGEN (DE) | 2006-2008 | WG B3.22 | Technical requirements for substations exceeding 800 kV | Takeshi Yokota | 2007-2009 | WG B3.15 | Cost Reduction of Air Insulated Substations | Koji KAWAKITA (JP) | 2005-2008 | WG B3.02 | Gas Insulated Substations | Wolgang DEGEN (DE) | 2004-2005 | WG B3.21 | Turnkey Substations | Tibor Kertesz (Canada) | 2007-2010 | WG B3.06 | Substation Management | Johan Smit (NL) | 2004-2008 | WG B3.10 | Primary /Secondary system interface modelling for total asset performance optimization | Frank BALDINGER (NL) | 2006-2008 | WG B3.01 | Substation concepts | John FINN (UK) | 2004-2006 |